Summer days, its tough to write all the items accomplished lately when getting home late. I'll try a summary:
Enlarged systems tunnels, fastened down tunnels, holes in panel for fuel & other. Pedal stops-started, pedal springs on, lights marked and plugged, wing bus bar almost finished, coax for NAV, COM and Transx complete and installed. ELT wire installed, more aileron clearance and protectors modified. Wingtips on and need outside fasteners, wire install stand offs and silicone, oil overflow valve on, air clamps almost complete, sidewall brackets started, preparing tail wheel lock lever &fuel line. Safety wired ailerons & close counterbalances. Some painting on tips & exhaust. Fiber glassed cowling radius's to scoop, headlight bracket & wire route on. Software upgrade on Dynon and pins in connected/connected magnetometer. Other items if I can check my lists tomorrow.
First time to sit in the seat pan and check leg length...all good.
Need:
Electric standoff's firewall forward, finish side load brackets (3 plies each). passenger stick machine part, need ELT coax made, and everything else on my list to check tomorrow. Paint inside of cowl & find heat tape. Find why I have a COM error on the radio, why transx won't find Dynon altitude. Getting closer every day. Also update excel of hours and details spent so far on plane.
Translate
Sunday, July 8, 2012
Tuesday, June 26, 2012
Log 37
Monday - Just to record more work from 4 to 11 pm:
Enlarged holes in rear spar of wing, and fuselage bulkhead for larger systems tunnel, installed larger tunnel. Cut out forward tunnel from wing to panel, but will need a second tunnel for air and coax. Cut two holes in panel for (2) fuel lines from fuel selector and system tunnel. Removed selector valve. Two more connectors on Strobe lights finally complete with new pins/connector modified for size (now just need power wires). Cleaned wingtip clearance for aileron counterbalances, a few coats of paint on elevator counterbalances & horizontal to fuselage join. Cut off passenger control stick...will make it removable. Strobe & ELT wire in aft tunnel run (now need COM coax, pitch servo wires & static air run from empennage).
Enlarged holes in rear spar of wing, and fuselage bulkhead for larger systems tunnel, installed larger tunnel. Cut out forward tunnel from wing to panel, but will need a second tunnel for air and coax. Cut two holes in panel for (2) fuel lines from fuel selector and system tunnel. Removed selector valve. Two more connectors on Strobe lights finally complete with new pins/connector modified for size (now just need power wires). Cleaned wingtip clearance for aileron counterbalances, a few coats of paint on elevator counterbalances & horizontal to fuselage join. Cut off passenger control stick...will make it removable. Strobe & ELT wire in aft tunnel run (now need COM coax, pitch servo wires & static air run from empennage).
Monday, June 25, 2012
Log 36
Someone asked, when will I finish?? I'm hoping this summer, but you never know. Maybe even early summer.....depends on focus.
Thanks
to hang glider pilots like Bill Jensen, Andrey Gusev, Steve Alford, Len
Baron, Paul Dees, a few others, my Boeing friends, my other flying friends, I've been moving along.
Sunday June 24th:
A few years back, I went to the Reno Air Races with no
idea I'd work on a glasair project. Bill Jensen and I went to the
glasair booth/Jeff Lavelle's pit location, got a free shirt and Jeff
signed it. http://www.glasairaviation. com/inthenews/Glasair%20Sets% 20New%20Speed%20Record%20At% 20Reno%20Air%20Races1.pdf . Jeff's
been up to 362 mph, a speed I'll never go, but he's local at Paine
Field. Today, he was passing by and stopped to look. He came in and
examined my project and looking at everything, said it looks really good
from what he can see. My day was made at that point and it was pretty
cool to chat with him.
Rodney Tong and Robert Grigson, RV8 and Long EZ owners came by for an inspection. Robert is an expert with the Dynon D180 system I have. We went over things I need to do for retrieving data and hooking up the autopilot servo's. I'll have to modify some pin configurations on the connectors for the NAV and GPS, and add another connector to the wires for the magnetometer. All parts are ordered...not too expensive.
Andrey and other friends came by to help and have dialog for the electrical system overview and a few connections. We did quite a bit of electrical system testing. We spent time with the strobe system and wiring. I've epoxy'd the light covers on the wingtips, cleaned up yesterdays fiberglass on wingtips and a few other items. Added intercom knobs... I'll be moving the plane better tomorrow for first time loading the hangar with two full airplanes.
Sunday, June 24, 2012
Log 35 - Wing/Body Join Milestone
June 22, 2012 Marks the wing/body Join.
First, thanks to Jim, Paul Dees, Len Baron and Dan Thomas for joining me for the plan thought up a couple days ago to join the wings to the fuselage! No way I could have done it myself. Everything went smooth. Jim and Dan are experienced airplane builders and all of us work at Boeing. There was some grunting and moaning but we got a plan, thought it out and got everything pinned in place and fastened. WHAT AN ACCOMPLISHMENT! It feels really good to get this done and timing has to be precise as once the wing is in, access is extremely limited in critical areas. It was perfect!!
Wing installed, (2) leading edge (LE) fasteners, (12) shear load fasteners on LE, (2) trailing edge (TE) fasteners.
Also, thanks to Nick Smith for helping to resolve rudder system deflection clearance issue (can be viewed in photos). Thanks to Kurt for Brake system check and other work.
Post wing/body join accomplishments: elevator push rod, trim wheel, cables, springs, electrical for lights, cables, systems tunnel clearance and fastened. Full rudder systems check, rudder deflection check/repair. Fabricated rudder stops, headlight/camera electrical bracket run, headlight mounting bracket, extra fiberglass on wingtip protectors for aileron counterbalance stay out area, and closed foam on systems center tunnel.
Another good couple days. When I find the keys on the shelves somewhere, I can have engine run up milestone, but a few other items to cover first. :)
Sorry to get carried away but over 30 photos added at the end of this album.
First, thanks to Jim, Paul Dees, Len Baron and Dan Thomas for joining me for the plan thought up a couple days ago to join the wings to the fuselage! No way I could have done it myself. Everything went smooth. Jim and Dan are experienced airplane builders and all of us work at Boeing. There was some grunting and moaning but we got a plan, thought it out and got everything pinned in place and fastened. WHAT AN ACCOMPLISHMENT! It feels really good to get this done and timing has to be precise as once the wing is in, access is extremely limited in critical areas. It was perfect!!
Wing installed, (2) leading edge (LE) fasteners, (12) shear load fasteners on LE, (2) trailing edge (TE) fasteners.
Also, thanks to Nick Smith for helping to resolve rudder system deflection clearance issue (can be viewed in photos). Thanks to Kurt for Brake system check and other work.
Post wing/body join accomplishments: elevator push rod, trim wheel, cables, springs, electrical for lights, cables, systems tunnel clearance and fastened. Full rudder systems check, rudder deflection check/repair. Fabricated rudder stops, headlight/camera electrical bracket run, headlight mounting bracket, extra fiberglass on wingtip protectors for aileron counterbalance stay out area, and closed foam on systems center tunnel.
Another good couple days. When I find the keys on the shelves somewhere, I can have engine run up milestone, but a few other items to cover first. :)
Sorry to get carried away but over 30 photos added at the end of this album.
Thursday, June 21, 2012
Log 34 - Upcoming Milestone, Wing Installation
Took a day off for flight of 2 to Chelan to drop off Steve's 172. He covered fuel but it was only 15 gal round trip, very nice evening flight after work.
Inventoried and prepared for tomorrow's wing join to fuselage. I've written a few people and hoping to have help tomorrow loading the wing to the fuselage. Anybody want to join us for ideas and help tomorrow? Contact me russlfboe at g mail com .
Current: pumped in brake hydraulic fluid, completed more connectors to wing bus bar. May items mostly complete. Sanded on fuselage....cowling parts, dorsal fin... etc. for hours. Went over design with Kurt.
Inventoried and prepared for tomorrow's wing join to fuselage. I've written a few people and hoping to have help tomorrow loading the wing to the fuselage. Anybody want to join us for ideas and help tomorrow? Contact me russlfboe at g mail com .
Current: pumped in brake hydraulic fluid, completed more connectors to wing bus bar. May items mostly complete. Sanded on fuselage....cowling parts, dorsal fin... etc. for hours. Went over design with Kurt.
Monday, June 18, 2012
Post 33
A few more days of work: Sized, cut, rosined tunnels on Rib A and wingbox for systems. Connected/set up wires for wing electrical. Have plans for auto pilot servo's and strobe lights. Cleaned shop and organized new shelves. New roller tray for fathers day.
Thursday, June 14, 2012
Post 32
Had a couple long days working on cowling seal, electrical, systems tunnels, canopy installation and a few other smaller items. Also did some fit checks and clearances of the cowling with the baffle gap seals. Some work included Brian Jensen and Nick Smith to check the project out and help with a few things. Great progress and planning lately. I hope to stay on a roll.
Again, photos chronological here.
Again, photos chronological here.