- Caps on many control surfaces started.
- Bracket & prep for rear bulkhead.
- More parts in and prep for instrument panel cutouts/powder coat.
- aileron/flap installation for fit check, gap checks, control checks.
- wingtip light plan started, and design pinpoint, design review.
- engine prep for mounting.
- right side brake pedal cut for mounting.
No comments:
Post a Comment
I welcome your constructive idea's and comments, thanks.